Project Description
Project Data
Strategy Type:
New Land Estates
Property Type:
Project
Land Reg. Date:
20-08-2020
Date Listed:
22-10-2019
Property Id:
4099
Project Attachments
- 88B INSTRUMENT STAGE 1 (DRAFT).pdf
- 88B INSTRUMENT STAGE 2 (DRAFT).pdf
- Approved Plans DA 18 00299.pdf
- DEPOSITED PLAN STAGE 1 (DRAFT).pdf
- DEPOSITED PLAN STAGE 2 (DRAFT).pdf
- GMR Stage 1 Riverbank Dr Base Contract.pdf
- GMR Stage 2 Riverbank Dr Base Contract.pdf
- Price List 23nd December 2019 Faulconbridge Estate The Ponds.jpg